|
In the news |
|
|
A ribbon-cutting ceremony was held on February 8th, 2010 for the Kaiser
South Bay Parking Structure, a 5-level, 250,000 square foot, design-build parking
structure with 750 parking spaces in Harbor City, CA.
A grand opening ceremony was held on February 3rd, 2010 for the Scripps
Green Parking Structure, a 4-level (1 below grade), 255,055 square foot design-build
parking structure totaling 797 stalls for Scripps Health at Scripps Green Hospital
in San Diego, CA.
ARB Structures broke ground for the Long Beach Airport Parking Structure
on December 10th, 2009. Read about it at http://www.lbpost.com/ryan/7667
ARB Structures, Inc. was recognized at the 2009 Los
Angeles Architectural Awards for the Santa Monica Civic Center
Parking Structure. The structure was honored as a New Building
winner in the Civic category at the Hyatt Regency Century Plaza
on May 28, 2009.
ARB Structures, Inc. was featured in the April 2009
edition of Construction Today Magazine. Read the article at
http://www.construction-today.com/content/view/1383/126/1/0/ |
|
|
|
Current Projects |
|
|
Long Beach Airport Parking Structure – Long Beach, CA
5-level, cast-in-place 722,800 square foot design-build parking structure with 2,224 stalls at the Long Beach Airport.
Pauley Pavilion Renovation & Expansion – Los Angeles, CA
Structural concrete scope of the renovation and expansion of the Pauley
Pavilion, a multi-purpose arena at UCLA. The project consists of new
construction, renovation, and seismic upgrade including a two-story
subterranean building addition.
Scripps Green Parking Structure – San Diego, CA
4-level (1 below grade), 255,055 square foot design-build
parking structure totaling 797 stalls for
Scripps Health at Scripps Green Hospital.
Cal State University San Marcos Parking
Structure – San Marcos, CA 6-level, 490,866
square foot parking structure totaling 1,635 stalls on the
CSU San Marcos campus.
|
|